Pictures...as promised...
Still have a few loose ends to tie up, but should be done in about 2 weeks or so--this was my garage--it was converted over the last 6 months to what you see here. All the lights, shades, and A/V (new Sony 285ES projector comes next week!) is controlled by a Control4 system.
There will be a vintage system on the opposite wall as soon as I get a clear coat on the maple racks I had made.
The fuse panel will be covered with artwork, as will the walls (gotta get to it soon).the motorized blackout shades on the windows are awaiting a rail system (to achieve total blackout)--should be in next week.
Cheers!
Very nice, I really like the wall cabinet....oh and of course all those BLUE METERS......we love the BLUE METERS!!
I see you also can Jam out on your bass as well, nice.....
Pictures...as promised...
Still have a few loose ends to tie up, but should be done in about 2 weeks or so--this was my garage--it was converted over the last 6 months to what you see here. All the lights, shades, and A/V (new Sony 285ES projector comes next week!) is controlled by a Control4 system.
There will be a vintage system on the opposite wall as soon as I get a clear coat on the maple racks I had made.
The fuse panel will be covered with artwork, as will the walls (gotta get to it soon).the motorized blackout shades on the windows are awaiting a rail system (to achieve total blackout)--should be in next week.
Cheers!